Conducting tests in construction

AZERTUNELSUTIKINTI construction services include the following tests and GPR surveys:
 - Standard load tests of piles up to 2000 tons.
 - Testing of piles for dynamic loads.
 - Determination and search of pile defects by ultrasound.
 - Detailed survey of the geological structure of the soil.
 - Determination of density and category of soil.
 - Search for hidden underground communications (pipelines, cable, collectors, drainage networks) and the definition improvement of engineering networks.
 - Inspection of concrete structures, bridges, roads.
 - Search and localization of various defects in reinforced concrete building structures (voids, sinks, cracks, etc.)
 - Detection of hidden electrical wiring, cables, fittings in concrete structures.
 - Determination of road and foundation defects.
 - Determination of the thickness and structure of the road surface layers.
 - Control of the conformity of the structure of the road surface to the design documentation.
 - Determination of thickness, strength and defects of foundation slabs.

Method of static testing of a bored pile for pressing and pulling loads (test trials) of the static pressure test of the reinforced concrete drilling-filling pile located at the foundation of the abutment of the bridge built over Valvalachay in accordance with the requirements of GOST 5686-2012 and the test results during the "Construction of the Baku-Russian Federation State Border Motorway" project of the "Azertunelsutikinti" company.

Картинки по запросу значок пдф

 

WhatsApp