Construction and design of tunnels and microtunnels

Tunnels are horizontal or inclined underground (including underwater) engineering structures designed for transport purposes, water crossings and construction of engineering communications. The depth, length, location of the tunnel in the plan and profile, the shape of the cross section depends on its purpose, topographic, geological and climatic conditions of the construction site. Constructively, tunnels consist of the following elements:

- a cavity excavated in the earth's crust called a drill pipe

- temporary reinforcement structures installed along the perimeter of the drill pipe and receiving the pressure of the surrounding rocks;

- permanent cladding along the perimeter of the inner cavity of the tunnel, with a protective thin-walled structure consisting of monolithic or prefabricated elements, replacing temporary fastening structures; the cover absorbs the pressure of the surrounding rocks and protects the tunnel from groundwater;

- entrance and exit parts of the tunnel called tunnel portals; portals ensure the stability of soil slopes at the entrance and exit of the tunnel and give the tunnel an architectural appearance;

- ramps are provided at the entrances and exits to protect underwater and mountain tunnels from flooding; The ramp walls are a sloping pan made of reinforced concrete with a reference shape.

Tunnel design. The cross-section of the tunnels is designed in the form of horseshoes or circles, depending on the type and condition of the rocks that make up the surrounding soil. However, most of the tunnels to be built on solid hard rock that does not show lateral pressure are designed with vertical walls.

The dimensions of the cross-section of the tunnel depend on the overall dimensions of the train passing through the tunnel (for railway tunnels) or the class of the road drawn from the tunnel and the number of lanes (for traffic tunnels), as well as the location of engineering communication networks inside the tunnel (power supply, lighting, ventilation, signaling). are taken depending on. In terms of plan, the tunnel can be straight or curved. The main construction materials for the construction of tunnels are monolithic and precast reinforced concrete, cast iron and steel.

Construction of tunnels. Depending on the depth of the tunnel, open or closed construction method is used for its construction. In the open construction method, a large trench is dug from the ground surface to the level where the tunnel structures are located, and after the tunnel is built, this trench is filled with soil and the damaged surface is restored. In the closed construction method, horizontal mining is carried out at the level where the tunnel structures are located underground, the excavated soil is removed from the entrance portal of the tunnel, along the perimeter of the drill pipe, first with temporary reinforcement structures and then with a permanent cover. The technologies used in the closed tunnel method are different, and the most commonly used methods are:

- mining technologies: manual excavation, use of drilling and blasting operations, use of mining combines;

- technologies with the use of tunnel drilling-transition shields: with the use of non-mechanized tunnel drilling-transition shields, with the use of mechanized tunnel drilling-transition shields, with the use of tunnel drilling-transition complexes;

- special technologies: push-and-pass technology, piercing technology, advanced drilling pipe installation technology called "pilot tunnel", so-called "wall in the ground" technology, Austrian method using a flexible arch, compressed air technology, rock freezing technology, rock concrete impregnation technology.

Small cross-section microtunnelsare being built to lay pipelines and engineering communication lines underground without trenches. Microtunnel technology allows to build engineering communication networks in the limited space of the city, under buildings and structures, under rivers, under railways and highways. Microtunnel technology minimizes the negative impact of the construction process on the environment and does not disrupt the stable normal operation of the city.

Microtunnel technology is as follows.

Along the route of the future underground tunnel, at a depth of 50-500 m from each other in the depth of the microtunnel, two vertical wells are being built - the initial and receiving wells. The diameter of the wells is up to 6 m, the wells can be circular or square in plan. To drill the microtunnel, a special jack station and a tunnel drilling-transition shield are installed in the starting well. The tunnel drill-shield is connected to a hydraulic system to clear the drill pipe of the microtunnel from the ground. At the designed depth, the soil is drilled with the cutting wheel of the tunnel drill-shield. The bentonite water mixture is pumped from the above-ground settling tank through the pipes of the hydraulic system to the drill pipe, where it is mixed with the excavated soil and returned to the settling tank through the pump. Soil mixed with water settles in the diluent tank, after which the water is reused in the technological process.

As the tunnel drill shield travels a certain distance underground, a special reinforced concrete pipe is lowered into the starting well and the jack pushes the pipe into the microtunnel pipe. The pipes are continuously lowered into the starting well until the tunnel drilling shield is excavated underground and exits the receiving well, interlocking, and the jack pushes them into the microtunnel tube. As a result, the tunnel shield emerges from the ground, and a pipeline of reinforced concrete pipes remains under the ground. Upon completion of drilling, the tunnel drill-shield is dismantled, but the initial and receiving wells are converted into control wells.

By changing the size of the tunnel drill-shield, it is possible to build underground microtunnels with a depth of up to 30 m and a diameter of 250 mm to 3600 mm.

A special laser system that is resistant to changes in ambient temperature conditions ensures the precise passage of the microtunnel along the designed route. The process of construction of microtunnelsis fully automated, and the participation of a specialist operator consists only in controlling the passage of the tunnel drill-shield along the project route.

The main advantages of microtunnel technology over traditional trench drilling methods are:

- job safety: in hazardous work areas - in the microtunnel and shield, there is no need for staff;

- high construction speed;

- high accuracy of construction: the deviation of the microtunnel from the route for every 1 km of length in the plan and profile can not exceed 2 cm;

- no subsidence can occur on the ground surface where the microtunnel route passes, and therefore it is possible for microtunnels to pass safely under any buildings or structures;

- microtunnels can be built on all types of rocks.