In recent years, the appearance of the capital of Azerbaijan, Baku, has undergone drastic changes - you are unlikely to recognize the city now.
A sparkling skyline is being built along the coast, the city is full of new hotels, residential and shopping centers, a pedestrian center has been rebuilt, while at the same time, the historical buildings and development of the Old City are carefully preserved. New subway lines are being laid, gardens and parks, new highways are being laid. One of the largest construction companies in the country, AZERTUNELSUTİKİNTİ, is implementing a project on the coastline of the city related to the reconstruction of the old passenger port and the construction of new hotel and residential complexes.
The work involved 3 PTC vibropiledrivers, two 65HD and one 30H1A.
The 65HD operates on AZ36-700 and AZ28 sheet piles with a length of 18 m, and AZ18 piles are also used. The vibratory loader is mounted on a Liebherr crawler crane with a capacity of 60 t and is equipped with a PTC 600C power plant.
30H1A drives smaller sheet piles and casing strings.
Soils: sandy clay, in some places layers of denser plastic clay.